September 20, 2014
Sunken Brick Patio
This project took the team 3 days to finish. The Barkman patio blocks required a solid foundation with 10 inches of tamped crusher dust base. Its a sunken patio so it has a retaining wall surrounding the patio.
This project took the team 3 days to finish. The Barkman patio blocks required a solid foundation with 10 inches of tamped crusher dust base. Its a sunken patio so it has a retaining wall surrounding the patio.
3511 Wascana St.
Regina, SK S4S 2H2
306-209-6569
Andrew@SignatureRegina.com
Regina Floral Conservatory 